Move officewithout losing aworkday
We plan and deliver the whole IT side of your move - audit, safe shutdown, cabling, network setup, and testing - with transport run by our trusted removals partner under one shared plan. Your team logs off in the old office and starts the next working day in the new one.
Get a Free Quote
Moving office is stressful. IT shouldn't be.
We solve the primary challenges businesses face during relocation, from connectivity gaps to hardware protection. For the full week-by-week plan, read our London office move IT checklist.
Zero downtime
Every hour offline costs money. We plan moves to ensure your team is operational by Monday morning.
Secure handling
We decommission, label and prepare every server and workstation for transit; our specialist removals partner moves them. Two crews, one plan, no gap in between.
Connectivity experts
Fibre installation in London takes 6-9 months. We audit your new site early and provide 4G/5G failover if needed.
Single point of contact
We coordinate with ISPs, cabling contractors, and removal companies so you don't have to.
The process
Our three-phase approach
Meticulous planning and execution for a smooth transition.
Pre-Move Planning
“Comprehensive audit and planning to ensure zero surprises on moving day.”
Site Survey
Full assessment of both current and new locations.
Connectivity Check
Verify fibre availability (warning: 6-9 month lead times).
Desk Mapping
Plan workstation positions and cable runs.
Infrastructure Audit
Document all servers, workstations, and network gear.
Move Day Execution
“Professional de-installation, transport by our removals partner, and complete reinstallation.”
Partner Transport
Our vetted removals partner carries the kit; we hand over, track the schedule, and receive at the other end.
Server Room Setup
Rack installation, power distribution, and cooling checks.
Workstation Setup
Per-user installation of monitors and peripherals.
Network Config
Switches, routers, firewalls, and WiFi access points.
Post-Move Support
“We don't leave until everything works. Plus ongoing support for the critical first days.”
Connection Testing
Verify every workstation, printer, and phone.
Day-One Support
On-site technician for immediate troubleshooting.
Staff Orientation
Quick briefing on the new setup and any changes.
Documentation
Updated network diagrams and asset registers.
Pricing
Predictable pricing
Starting points for every size of move. We quote after a site survey - no surprises.
Small Office
1–10 Users
£1,500+VAT
- Pre-move site survey
- Every workstation set up & tested
- Network equipment relocation
- Day-one support included
Medium Office
10–50 Users
£4,000+VAT
- Full infrastructure audit
- Detailed project management
- Server room migration
- Structured cabling
- 72-hour priority support
Large Office
50+ Users
£15,000+VAT
- Dedicated project manager
- Phased migration planning
- Comms room build-out
- Multi-day migration support
These are starting points. Every move is different - we quote after a free site survey. All prices exclude VAT.
In practice
What this looks like on a Tuesday
The move that works on Monday morning, and the fleet refresh that rides along with it - sourced market data, our method against each.
IT relocation
The move that works on Monday
The removals van is booked and the plan says IT “comes along with the boxes”. Nobody has ordered the internet line yet.
How we run itSmall business
Borrowed time - the Windows 10 exit
The paid safety net expires on 14 October 2026. Half the fleet can't upgrade, and nobody has wanted to open the conversation.
How we run itFAQ
Relocation FAQ
Most small and medium moves (up to 50 users) complete over a single weekend (Friday PM to Sunday PM). Larger moves are often phased over multiple weekends.
This is common in London. We audit connectivity 4-6 weeks out. If the ISP is delayed, we deploy interim 4G/5G business failover to keep you working.
Evolfe holds £6 million Public and Products Liability cover for its IT contracting work, subject to the policy terms. Physical transport is scoped separately: if a removals or courier partner is involved, responsibility and any Goods in Transit cover are confirmed in the written quote before the move.
The physical move is our removals partner's job, and the IT is ours: they move it, we make it work. We coordinate both crews under one plan, so you deal with a single point of contact for the whole move.
Need ongoing IT support after the move?
An office move is often when businesses rethink their IT. Explore our IT support for business, coworking tech support, and services for independent schools.
Plan your move today
Get a detailed quote within 48 hours of your site survey.

